Shanxi Molin Technology Co., Ltd. Back to cases 中文

Power inspection · Linfen, Shanxi

Drone inspection of transmission lines

Organize corridor and component imagery by tower ID across mountainous terrain, ravines and the Fen River corridor. Link items for review with component locations and photographs.

Transmission corridor in loess ravines with a field inspector
Transmission corridor in loess ravines with a field inspector · Illustrative image

Inspection scope

Routine and emergency inspections for 35–220 kV corridors, towers and visible components. Voltage classes, line length and tower counts are confirmed for each project.

  • Corridor and surroundings imagery
  • Tower overviews, insulators and crossarms
  • Priority sections and findings for manual review

Workflow

  1. Confirm line sections, tower IDs and inspection scope.
  2. Collect corridor and component imagery by section and tower.
  3. Index imagery by tower and component and compile findings for review.
Reference view of a tower crossarm and insulators
Reference view of a tower crossarm and insulators

Deliverables list

  • Line and tower imagery · Indexed by section, tower and component.
  • Findings register · Includes tower ID, component location, image references and review notes.
  • Inspection report · Summarizes scope, findings, review status and recommended actions.

Images illustrate the application. Delivery scope and acceptance criteria are agreed for each project.

Includes sample deliverables and acceptance checks.

Plan a line inspection

Include the section, voltage class, line length or tower count.

Describe your inspection needs